Sharman Shaw creates BT and BMW hospitality suites for London 2012

Sharman Shaw has revealed it was appointed to build two hospitality suites for BMW and BT during the London 2012 Olympic Games.

The BT Olympic Hospitality Centre had an internal floor space of 300 square metres with an additional 200 square metre balcony.

The BMW Olympic Hospitality Centre was of a similar size and encompassed lounge areas, bar and self-serve food areas as well as a high-tech interactive area with integrated iPad interface and plasma screens.

Carl Sharman, managing director, Sharman Shaw commented: “This has been a very exciting project for our company and we have received amazing feedback from the clients. It is an honour to have played a part in London 2012 and the results speak for themselves.”